Description
Target the massive residential boom along the HWY 211 corridor, where thousands of new homes are already approved. This ±45.3-acre upland site sits on a high elevation off HWY 211, offering a ''shovel-ready'' profile with natural drainage. As the primary artery for high-net-worth seasonal tourists and year-round residents, this location is ideal for Southern Commercial, medical complexes, or retail centers. Price reduced and calculated solely on upland acreage Prime 45-Acre Upland Development Site | #1 Growth Market in NC Strategic Location: Direct frontage on HWY 211, the primary corridor for affluent barrier island traffic (Oak Island/Southport). High-Value Topography: Highest land mass in the area with ±45.3 acres of confirmed uplands (57% of total area). Infrastructure Ready: Natural drainage and established water retention capacity. Unmatched Growth: Located in the #1 fastest-growing county in NC and 14th in the U.S. (2024-2025). Pricing Advantage: Price is strictly based on the usable upland area--immediate equity potential for commercial or mixed-use development. Ready-to-Develop Utility Infrastructure Positioned for high-capacity industrial or commercial use, this site boasts superior utility access. Water supply is secured via a 12-inch main on the Hwy 211 south right-of-way. Wastewater capacity is readily available through a 16-inch high-pressure force main on the north side, allowing for a standard pump station connection. Flexible sanitary solutions include potential on-site systems for fast-track projects. Infrastructure & Utilities Water: Immediate access to a 12-inch county water main located on the south side of Hwy 211. Sewer: A robust 16-inch high-pressure sewer force main is located on the north side of Hwy 211. Development requires an on-site lift station and collection system to connect to this line. Alternative Wastewater: On-site septic systems are permissible, subject to County Environmental Health approval. Compliance: Per local ordinance, sewer service requires the design and construction of an approved collection system (gravity, low-pressure, or vacuum).
-
0BEDS
-
75.34ACRES
-
0BATHS
-
01/2 BATHS
School Ratings & Info
Description
Target the massive residential boom along the HWY 211 corridor, where thousands of new homes are already approved. This ±45.3-acre upland site sits on a high elevation off HWY 211, offering a ''shovel-ready'' profile with natural drainage. As the primary artery for high-net-worth seasonal tourists and year-round residents, this location is ideal for Southern Commercial, medical complexes, or retail centers. Price reduced and calculated solely on upland acreage Prime 45-Acre Upland Development Site | #1 Growth Market in NC Strategic Location: Direct frontage on HWY 211, the primary corridor for affluent barrier island traffic (Oak Island/Southport). High-Value Topography: Highest land mass in the area with ±45.3 acres of confirmed uplands (57% of total area). Infrastructure Ready: Natural drainage and established water retention capacity. Unmatched Growth: Located in the #1 fastest-growing county in NC and 14th in the U.S. (2024-2025). Pricing Advantage: Price is strictly based on the usable upland area--immediate equity potential for commercial or mixed-use development. Ready-to-Develop Utility Infrastructure Positioned for high-capacity industrial or commercial use, this site boasts superior utility access. Water supply is secured via a 12-inch main on the Hwy 211 south right-of-way. Wastewater capacity is readily available through a 16-inch high-pressure force main on the north side, allowing for a standard pump station connection. Flexible sanitary solutions include potential on-site systems for fast-track projects. Infrastructure & Utilities Water: Immediate access to a 12-inch county water main located on the south side of Hwy 211. Sewer: A robust 16-inch high-pressure sewer force main is located on the north side of Hwy 211. Development requires an on-site lift station and collection system to connect to this line. Alternative Wastewater: On-site septic systems are permissible, subject to County Environmental Health approval. Compliance: Per local ordinance, sewer service requires the design and construction of an approved collection system (gravity, low-pressure, or vacuum).
Related Properties
The data relating to real estate on this web site comes in part from the Internet Data Exchange program of Hive MLS LLC, and is updated as of 2026-05-16T18:32:43.24. All information is deemed reliable but not guaranteed and should be independently verified. All properties are subject to prior sale, change, or withdrawal. Neither listing broker(s) nor The Legacy Team | Intracoastal Realty shall be responsible for any typographical errors, misinformation, or misprints, and shall be held totally harmless from any damages arising from reliance upon these data. © 2026 Hive MLS LLC